Maintenance case of steam generator formwork

Source: unknown popularity: Time of publication: 10:57, September 29, 2020
 Steam generator concrete curing case
 

  72KW Electric heating Steam generator Maintenance cases of fixed formwork platform

Xindaneng 72kw electric heating steam generator can generally be used for the maintenance of 4 formwork platforms at the same time. According to the manufacturing process of PC components, it is generally divided into two types: pipe laying on the stage and pipe laying under the stage.

Pipe laying on the stage: (it is mainly aimed at the secondary formwork erection of cement components, and the component with insulation board in the middle, and the steam is introduced from the bottom, and the heat conduction effect is not good, so the maintenance method is adopted) as shown in the figure:

 

 Xindaneng steam generator field maintenance case

Pipe laying under the platform: The pipe laying under the stage will fix the two ends of 12 meters long at the bottom of the mold table. A 25 minute steel pipe will be opened alternately on both sides at an interval of 80 cm, and 3.2 minutes of small holes will be opened to steam out, and the end of the steel pipe will be blocked. At the same time, the steam can flow up from the gap around the die. The upper and lower surfaces of the mould can be heated at the same time by covering the shed cloth on the die table, and the aging is fast.

 

 Xindaneng steam generator field maintenance case
 

72kw motor heat consumption per hour is about 50 kwh. The equipment can be equipped with time-controlled switch in steam curing to realize concrete pouring in the daytime and steam curing at night. The electricity consumption at night is about 0.33 yuan, and the power consumption for 4 / 5 hours of steam curing is about 200 kwh, and the cost is 60 yuan. The cost of each mould is about 15 yuan.

The equipment is equipped with temperature control system, which can effectively control the steam curing temperature. When the temperature reaches 60 ℃, it can automatically stop, and when it is lower than the set curing temperature, it can not only effectively save energy, but also effectively reduce energy consumption Concrete curing High grade cement, easy to control temperature
 


  Contact information of xindanero Manager